Quick Answer
A Gold Mining Simulator Tier 5 setup uses the Glacier Creek shaker, a Reinforced Trommel and two Gravel Pumps. Upgrade the whole tier at once, and dig carefully, or the extra gold does not show up.
What parts are in a Gold Mining Simulator Tier 5 setup?
The Tier 5 setup swaps in three new main machines: Glacier Creek, the Reinforced Trommel and two Gravel Pumps.
| Tier 5 item | Amount |
|---|---|
| Glacier Creek (the Tier 5 shaker) | One |
| Reinforced Trommel | One |
| Gravel Pump | Two |
| T-DJ Sluice Box | Two |
| S-Rocks Sluice Box | One |
| S-T Sluice Box | One |
| Conveyor Belt Hopper | One |
| Conveyor Belt | One |
| Big Power Generator | One |
You also need a Front-End Loader, or a big excavator with a dump truck, to feed the Gold Mining Simulator Tier 5 setup.
Glacier Creek, two Gravel Pumps and the Reinforced Trommel come from the machine store.
Shown at 01:20 in Hugz’s video.What hoses, cables and mats does the Tier 5 setup need?
The Gold Mining Simulator Tier 5 setup runs on a Big Diesel Water Pump and four high voltage lines.
Water:
- 1 Big Diesel Water Pump.
- 2 Huge Water Hoses, one into the river and one out of the pump.
- 1 Huge Water Splitter.
- 2 Fat Water Hoses and 2 Thin Water Hoses.
- 1 Water Splitter.
Power:
- 4 High Voltage Power Cables, for the hopper, the conveyor, Glacier Creek and the trommel.
- 2 Low Voltage Power Cables, one for each gravel unit.
Mats and grates:
- 6 Miners Moss and 3 Miners Grills on each side.
- 4 Sluice Box Grates in the main sluice box.
- One hog pan with pump on each side, with its sluice box core, extension and mats.
- A bucket under each gravel unit.
How do you set up the Gold Mining Simulator Tier 5 setup?
Place the big machines from the bottom up and add the small items last.
- Hook four cables to the sluice box with the flared ends.
- Swing both gravel units into place.
- Lower both T-DJ sluice boxes into their slots.
- Lift the Reinforced Trommel into place.
- Place Glacier Creek, the conveyor and the hopper.
- Park the Big Power Generator and the diesel unit for water.
- Run high voltage power to the hopper, the conveyor, Glacier Creek and the trommel.
- Fit the four Sluice Box Grates.
- Set a bucket under each gravel unit.
- Place both hog pans with pumps, their cores, extensions and mats.
- Fill each side with 6 Miners Moss and 3 Miners Grills.
- Run water from the river through the Huge Water Splitter to each side.
- Plug the low voltage cables into both gravel units.
Lower each machine onto its outline.
Shown at 15:00 in Hugz’s video.How do you pay for the Gold Mining Simulator Tier 5 setup?
Sell your Tier 4 machines to fund the Gold Mining Simulator Tier 5 setup. The machine store buys used gear at its sell point.
| Used Tier 4 machine | Sale price seen |
|---|---|
| D-Rocker | $192k |
| Trommel | $103k |
| Front-End Loader | $58k |
Drop old Tier 4 machines at the sell point for cash.
Shown at 03:50 in Hugz’s video.Machine prices change with the seasons. The day before permafrost brings the lowest prices. One player bought a $6 million setup for about $3 million on that day.
Is the Gold Mining Simulator Tier 5 setup worth it?
Yes, if you upgrade the whole tier and dig cleanly. A half upgrade or careless digging hides the gain.
What players measured:
| Test | Result |
|---|---|
| Two Cordylus loads, Tier 3 vs Tier 5 | 48,071 g vs 53,299 g |
| Diamond Creek cleanouts, Tier 3 vs Tier 5 | About 1,200 oz each time |
Dirt you push, drop or dig from below is rebuilt with low gold. Work one square at a time from the top down.
Tier 4 first? A Tier 4 setup only counts with all its parts. That means the D-Rocker, Old Arnold's Trommel and two Planters. Swapping the shaker alone barely changes the result.
The finished Tier 5 plant running a load.
Shown at 22:20 in Hugz’s video.Tier 5 setup or Orange Beast?
Most players pick the Orange Beast instead. Others prefer a Gold Mining Simulator Tier 5 setup.
One long-time player found Tier 5 cleanouts close to the Orange Beast. The Orange Beast needs about 80 dump truck loads to fill its mats. The Orange Beast also has very few worker slots.
See the Gold Mining Simulator Orange Beast setup for that plant.
Where to go from the Gold Mining Simulator Tier 5 setup
Compare every tier on the Gold Mining Simulator wash plant setup page. If you skipped steps, go back to the Gold Mining Simulator Tier 3 setup. Machine prices are on the Gold Mining Simulator equipment list.
FAQ
Glacier Creek. The Gold Mining Simulator Tier 5 setup pairs it with a Reinforced Trommel and two Gravel Pumps.
Check that every part of the Gold Mining Simulator Tier 5 setup is installed. Dig one square at a time from the top.
The day before permafrost. Prices are highest in summer.
Most players pick the Orange Beast. Some prefer Tier 5 because the Orange Beast takes about 80 truck loads to fill its mats.