Quick Answer
A Gold Mining Simulator Tier 3 setup needs a Shaker, a Trommel, two Duplex Jigs, four sluice boxes and a Big Power Generator. Buying the whole Tier 3 setup costs about $278k, so save around $300k before you start.
What do you need before a Gold Mining Simulator Tier 3 setup?
You need the Magnetite Separator and Wave Table from your Tier 2 setup already on the claim. Those two machines keep working at Tier 3, so you do not buy them again.
Sell the Small Excavator if you rented it. Rent the Big Excavator to lift the heavy Tier 3 parts. Its daily rent is just over $3k, so return it once the Tier 3 setup stands.
No Tier 2 yet? Start with the Gold Mining Simulator Tier 2 setup.
What parts are in a Gold Mining Simulator Tier 3 setup?
A Gold Mining Simulator Tier 3 setup has six main machines plus power. All of them come from the machine store.
| Tier 3 part | Role in the Tier 3 setup |
|---|---|
| Shaker (x1) | Top machine of the Tier 3 setup, fed by the loader |
| Trommel (x1) | Sits above the T-DJ sluice boxes |
| Duplex Jig (x2) | The two gravel pumps at the bottom |
| S-T Sluice Box (x1) | Connects the shaker with the trommel |
| S-Rocks Sluice Box (x1) | Takes the smaller rocks away from the shaker |
| T-DJ Sluice Box (x2) | Runs from the trommel to each Duplex Jig |
| Big Power Generator | Powers the shaker, the trommel and both jigs |
The Big Power Generator costs $50k to buy or $2k a day to rent. Sluice boxes are cheap, so buy those even if you rent the rest.
Each Tier 3 machine can be bought or rented by the day.
Shown at 02:00 in Krypt0nite’s video.How much does a Gold Mining Simulator Tier 3 setup cost?
Buying the full Gold Mining Simulator Tier 3 setup costs about $278k. Renting it costs about $12k a day, plus $2k for the generator.
| Cost item | Price |
|---|---|
| Full Tier 3 setup, bought | About $278k |
| Full Tier 3 setup, rented | About $12k per day |
| Big Power Generator | $50k, or $2k per day |
| Pumps and hoses | About $43k |
| Front-End Loader | $152k, or $6k per day |
Renting has a risk. If you cannot pay the daily rent, the machine store takes the rented machines back. Set Time scale to x1 in Settings, under Game. Days pass slower, so you pay less rent while you build.
What hoses and cables does the Tier 3 setup need?
The Gold Mining Simulator Tier 3 setup runs on one water pump, two Huge Water Hoses and a few splitters.
Water:
- 1 water pump. A diesel pump breaks down less often, so start with that.
- 2 Huge Water Hoses. One goes from the pump into the stream, with no filter needed.
- 1 Huge Water Splitter and 2 Water Splitters.
- 3 Fat Water Hoses when you also run hog pans.
- 5 Thin Water Hoses for the Magnetite Separator, Wave Table, Gold Nuggetator and two hog pans.
The hoses and splitters come from the parts shop.
Shown at 07:30 in Krypt0nite’s video.The current version needs the Hog Pan Pump on these hog pans. The hog pan without a pump no longer works there.
Power:
- 3 High Voltage Power Cables for the shaker, the trommel and a splitter.
- 5 Low Voltage Power Cables for the Magnetite Separator, Wave Table, Gold Nuggetator and both jigs.
- 1 Power Splitter.
Small items:
- 4 steel cables of 5 m for lifting.
- About 10 buckets.
- 12 Miners Moss, six for each T-DJ sluice box.
- 6 Miners Grills, three for each T-DJ sluice box.
- 4 Sluice Box Grates for the main sluice box from shaker to trommel.
A Gold Nuggetator cleans Miners Moss fast. Without it, rinse each moss in a bucket of water.
How do you assemble a Gold Mining Simulator Tier 3 setup?
Build a Gold Mining Simulator Tier 3 setup from the bottom up. Each machine snaps into place only in the right direction.
- Lift each Duplex Jig with the Big Excavator and four steel cables.
- Turn the jig until it matches the outline, and lower it until it snaps.
- Place both T-DJ sluice boxes, with the outflow end facing the front.
- Lower the Trommel on top of them, with its motor at the back.
- Lift the Shaker, the S-T sluice box and the S-Rocks sluice box onto their outlines.
- Park the Big Power Generator out of the way and run the cables.
- Fit 6 Miners Moss and 3 Miners Grills in each T-DJ sluice box.
- Return the rented Big Excavator and feed the plant with a loader.
A Duplex Jig snaps in once it faces the right way.
Shown at 11:40 in Krypt0nite’s video.Move slowly while lifting. A steel cable snaps if a load snags on the ground or a tree. If a cable snaps, lower the load and hook a new cable before lifting again.
The Trommel goes on top of the T-DJ sluice boxes.
Shown at 16:40 in Krypt0nite’s video.How do you feed a Gold Mining Simulator Tier 3 setup?
A basic plant without a conveyor only takes dirt from a Front-End Loader. Add a Conveyor Belt Hopper and a Conveyor Belt to feed it with an excavator and a dump truck.
Dig from the top down, one square at a time. Dirt you push or drop is rebuilt with low gold.
What comes after the Gold Mining Simulator Tier 3 setup?
Tier 4 swaps in the Derocker, Old Arnold's Trommel and two Planters. Tier 5 uses Glacier Creek, a Reinforced Trommel and two Gravel Pumps. Upgrade a whole tier at once. One new machine on its own barely changes a cleanout.
Compare every tier on the Gold Mining Simulator wash plant setup page. Skip ahead with the Gold Mining Simulator Tier 5 setup. Prices for each machine are on the Gold Mining Simulator equipment list.
FAQ
About $278k buys the full Gold Mining Simulator Tier 3 setup. Save around $300k to cover hoses, cables and moss.
Yes. Renting it costs about $12k a day. The Big Power Generator adds $2k a day.
The machine is facing the wrong way. Turn it until it matches the outline and lower it again.
No. The current version needs the Hog Pan Pump on Tier 3 hog pans.
Big Fish unlocks when you set up a Tier 3 wash plant. Wash It All Away III needs a fully upgraded Gold Mining Simulator Tier 3 setup.



